Calrissian45
Active member
No, Caltrans is a state agency so that makes sense that they have to stamp them. I work for the Navy. We require drawings prepared by contractors to be stamped, but we don't have to stamp our own drawings. Critical or complex designs are usually done by contractors though.Do you work for Caltrans? because all the Caltrans plans I've seen are stamped by a PE. I'm just curious. Thanks.