S
stompbox
If the PE is a "level of competency in engineering" then by definition a PE (by nature of the required experience and by demonstrating the level of competency by passing at least one 8hr test) should in fact be more valuable to the company than an EIT. No it does not mean that he/she should be promoted or a project manager but the PE qualification should certianly be taken into consideration for promotion or project manager status over someone who is not registered.
The topic is about whether the passing score should be divulged not whether the PE means anything or not. Your statements imply that being registered as a PE doesn't have any relevance. That is BS.
I am not going to sit here and listen to you bad mouth the United Sattes of America.
i got a little off topic DiazWV summed up what i was saying pretty nicely.