I've searched the forum for this topic and can't seem to find satisfactory answers to my questions. That's why I'm starting this thread as a way for April 2016 (and future) examinees to decode the exam spec.
I'm hoping we can use this as a space to help each other:
II. Means and Methods
B. Construction Loads
What are we talking about here? How much a backhoe can lift without tipping? Loads on temporary structures?
Is that different than what is expected to be found for 2.C. Temporary structures and facilities?
:reading: :blink: d
Thanks
I'm hoping we can use this as a space to help each other:
- Make sense of the specifications
- Locate information and practice problems corresponding to items listed in the specifications
II. Means and Methods
B. Construction Loads
What are we talking about here? How much a backhoe can lift without tipping? Loads on temporary structures?
Is that different than what is expected to be found for 2.C. Temporary structures and facilities?
:reading: :blink: d
Thanks