Something , nothing yet . :bio:Nope. I've also been checking the Florida Verify License website and all it says is "Eligible for Exam".
I want my number already!!! lol A much better wait than waiting for the results. I can tell you that much!!
I called there last Thursday to ask and they told me it would be by the end of the week (last week) and here we are another week later, and they still haven't posted.My boss passed the Oct. '03 exam and received his # from the FL Board on Jan. 13, 2004. I guess the process is getting longer.
I just posted this on the FBPE "Customer Satisfaction Survey" section:
Its taking a really long time to get my License number. It took over 2 months to get the test graded by NCEES, which i understand is not your fault, but another month for the number is kinda long. Architects get their test graded and the number within 2-3 weeks. Its 2011 and I just feel there has to be a better way to do this.
No, I'm actually the president of my firm, check me out www.AtlasIncOnline.com. But i can get rid of my qualifying engineers once I can license my own company, and I wont have to pay them 15%-20% of my design fee's just to sit around my office and review and sign and seal stuff. So, no i dont get a raise, but it will start to save me money from day one.I just posted this on the FBPE "Customer Satisfaction Survey" section:
Its taking a really long time to get my License number. It took over 2 months to get the test graded by NCEES, which i understand is not your fault, but another month for the number is kinda long. Architects get their test graded and the number within 2-3 weeks. Its 2011 and I just feel there has to be a better way to do this.
AtlasDesign,
Do you get your raise once you have your licence number?
No, I'm actually the president of my firm, check me out www.AtlasIncOnline.com. But i can get rid of my qualifying engineers once I can license my own company, and I wont have to pay them 15%-20% of my design fee's just to sit around my office and review and sign and seal stuff. So, no i dont get a raise, but it will start to save me money from day one.I just posted this on the FBPE "Customer Satisfaction Survey" section:
Its taking a really long time to get my License number. It took over 2 months to get the test graded by NCEES, which i understand is not your fault, but another month for the number is kinda long. Architects get their test graded and the number within 2-3 weeks. Its 2011 and I just feel there has to be a better way to do this.
AtlasDesign,
Do you get your raise once you have your licence number?
Enter your email address to join: