I just posted this on the FBPE "Customer Satisfaction Survey" section:
Its taking a really long time to get my License number. It took over 2 months to get the test graded by NCEES, which i understand is not your fault, but another month for the number is kinda long. Architects get their test graded and the number within 2-3 weeks. Its 2011 and I just feel there has to be a better way to do this.
AtlasDesign,
Do you get your raise once you have your licence number?
No, I'm actually the president of my firm, check me out www.AtlasIncOnline.com. But i can get rid of my qualifying engineers once I can license my own company, and I wont have to pay them 15%-20% of my design fee's just to sit around my office and review and sign and seal stuff. So, no i dont get a raise, but it will start to save me money from day one.