woodslegend
Member
- Joined
- Jan 11, 2011
- Messages
- 13
- Reaction score
- 1
This is regarding example 1.4 in Transportation Depth Reference Manual. Isn't the present value to be calculated based on annual costs and annual benefits (P/A instead of P/F)? Isn't it wrong to sum all the values and assume it as a future value?