You mean shoving a PE answer sheet through a Scantron machine is harder than shoving a EIT answer sheet through a Scantron machine?PE Exam is harder to grade
It was this numerical day (Tuesday of the 7th week after the exam) that I received my e-mail from NCEES about the April 2010 exam. I received it between 2-3 PM (CST) in the afternoon.
Not crossing my fingers though. They don't seem to be following the Wednesday, Tuesday, Tuesday pattern that they have previously used.
This made me laugh......Wouldn't be the first time a civil engineer predicted something that didn't happen...
Have they had the chemical and 2-day structural score setting workshops yet?You mean shoving a PE answer sheet through a Scantron machine is harder than shoving a EIT answer sheet through a Scantron machine?PE Exam is harder to grade
Have they had the chemical and 2-day structural score setting workshops yet?You mean shoving a PE answer sheet through a Scantron machine is harder than shoving a EIT answer sheet through a Scantron machine?PE Exam is harder to grade
It's the same for me.The chemical cut score meeting was May 20-21st.
Have they had the chemical and 2-day structural score setting workshops yet?You mean shoving a PE answer sheet through a Scantron machine is harder than shoving a EIT answer sheet through a Scantron machine?PE Exam is harder to grade
Enter your email address to join: