Arggghhhhh.....
I've just returned from the other side of my cubicle, where I was reviewing crappy stormwater & septic system designs, all in response to my previous permit application deficiency notices. I just get so tired of looking at a set of hand-drawn plans, practically on a napkin, that don't even address half of the detailed comments I gave with my first (or second or third) deficiency notice. Read the fucking notice! Sometimes I just feel like giving up and approving the plans as-is. I mean why not - they aren't going to follow them anyway, and our inspectors aren't going to catch the mistakes.
Tell me this is abnormal... Tell me this is only because I am in the CNMI.... Tell me that the plans produced in the mainland are usually at least "mediocre" in quality.... I'd gladly take "mediocre" over "crappy" at this point.
![Frown :( :(](data:image/gif;base64,R0lGODlhAQABAIAAAAAAAP///yH5BAEAAAAALAAAAAABAAEAAAIBRAA7)
I've just returned from the other side of my cubicle, where I was reviewing crappy stormwater & septic system designs, all in response to my previous permit application deficiency notices. I just get so tired of looking at a set of hand-drawn plans, practically on a napkin, that don't even address half of the detailed comments I gave with my first (or second or third) deficiency notice. Read the fucking notice! Sometimes I just feel like giving up and approving the plans as-is. I mean why not - they aren't going to follow them anyway, and our inspectors aren't going to catch the mistakes.
Tell me this is abnormal... Tell me this is only because I am in the CNMI.... Tell me that the plans produced in the mainland are usually at least "mediocre" in quality.... I'd gladly take "mediocre" over "crappy" at this point.