Working for a structural firm, on a steel structural frame project, we have been asked to submit calculations for everything. Very specifically for footing and baseplate design. My boss got after me for saying “sure” when asked and has sent them an invoice for submission of the calcs. We have done this before, but not officially in a presentation binder etc... as i prepared it this time. And before it was just a discussion among civil/geo engineers and architects. What is your typical approach to this? My boss says he is hired for signed and sealed construction documents and not to submit calculations for others to have and use in the future. Now im kind of with him on the idea.