I've never dealt with shoring/reshoring. Can anyone explain problem 534 on the construction depth exam? Particularly, the (1.50 D-0.10 D) in the solution? Where is the 1.50 D coming from? I'm guessing its in one of the reference books but I haven't found it. Thank you

 
Last edited by a moderator:
https://www.google.com/search?source=hp&ei=JxexWqLWAsayzwLak52oCw&q=simplified+method+of+shoring+reshoring&oq=simplified+method+of+shoring+reshoring&gs_l=psy-ab.3..33i21k1.2345.9057.0.9186.45.42.0.2.2.0.164.3947.29j12.41.0....0...1c.1.64.psy-ab..2.42.3904.0..0j35i39k1j0i131k1j0i22i30k1j33i22i29i30k1j33i160k1.0.suiZYIA3kqk

Google is your friend. I used aci 347 section on shoring, and this pdf I found, the pdf spells it out better with drawings but doesn't quite explain it as good as ACI 347. Shoring was new to me too, and I had to do a few problems with shoring a few times to get the hang of it, and still wasn't 100% on it when it came test time but this helps. 

 