- Joined
- Jun 11, 2013
- Messages
- 35
- Reaction score
- 3
Part B - I'm calculating that the Brace force is a tad over the 70% limit of the AISC Seismic Provision limit of 30-70% of the total story force. Has anyone done this problem & is anyone getting the same result?
Also, the "solutions" do not even check this limit. I'm under the impression that for Braced frames, this 30%-70% limit must always be checked.
Advice or help is welcome! Perhaps i'm making an error...
Also, the "solutions" do not even check this limit. I'm under the impression that for Braced frames, this 30%-70% limit must always be checked.
Advice or help is welcome! Perhaps i'm making an error...