udpolo15
Well-known member
I am trying to scale a cost down from an estimate that has twice the capacity that is needed. (for a waste water treatment package plant). The cost/relationship isn't linear and I seem to recall a power rule you can use to scale the cost down (6/10 power rule or something like that). Can anybody point me in the right direction?