    Construction Operations and Methods

    Answer: This building is a concrete structure, which has concrete columns/shearwalls and slab. The answers A, B are incorrect because if you remove any scaffolding and slab formwork you must have jacks shoring that newly poured slab section immediately. C is incorrect because if you move the...
  3. C

    Construction Operations and Methods

    You are filling in a few days for the project engineer who is on vacation. The project is a 16 story building. The 4th floor slab was poured on Friday. On Monday you get a call from the design engineer informing that the concrete strength of the newly poured slab achieves enough strength for the...
  4. C

    Mock exam question

    For those who will take the WR/Envi depth, there are approx. 6 questions (15% in PM session) related to open channel flow. I bet at least one question is on Manning formula; but they don't give you a simple or straightforward question. Try this: A trapezoid cross section channel with bottom...
  5. C

    Construction: Temporary structure question

    You are assigned to be the project manager of a 20-story concrete building. The concrete structures from the second level to the top level are consistent. The construction schedule plans for one floor slab concrete pour per week. You need to estimate how many steel jacks it would need to support...
  6. C

    how much study is adequate? Please help

    I came up with an equation to estimate how much time needed to study and pass the PE exam Y=100*k-g-s-p In which: k=years after graduate, k=3 if it is 4-8 years, 3.0 if 9-13 years, 3.5 if 14-20 yrs and 4 if more than 20 yrs g: gpa in engineering , g=50 if B or better, g=0 if less than B s...
  7. C

    ARIZONA - RESULTS

    For any state which has the exam handled by ELSES: NCEES has released the results for the October 2008 Fundamentals of Engineering (FE) and the Principles and Practice of Engineering (PE) examinations. Your exam results will be available online until 12:00 a.m. EST, December 22, 2008. To access...
  8. C

    Prospects if you pass

    TxDoT Requisition #: 013262 Title: E429 / Deputy District Engineer II Occupation: Engineering/Engr Support Office (City): HoustonDistrict (Houston) Salary: $8,670.66 - $13,007.50 (M) Closing Date: 12/19/2008 Description:Assists in management and engineering oversight of all...
  9. C

    PE Certificate Frames

    I receive my TX PE certificate yesterday, I got 2 frames (real wood frame) from a dollar store for my college degree and the PE certificate. Looks good. I realize the way the Board sealed my certificate not like the college sheepskin: the Board made the embossed foil then attached/glued to the...
  10. C

    CALIFORNIA - RESULTS

    What you guys in California should do is to band together and have a serious talk with the Board's boss who are Arnold and the state senators and state representatives. They should have power to make the Board quicker in this exam result announcement. Briane: I passed the PE exam (TX) and I...
  11. C

    State Board Application

    If you know a state rep. or a state senator, talk with him/her to contact the Board. This would jump start the idling Board.
  12. C

    Construction Studying

    KAPLAN new catalog states that they have new version of Civil Engineering PE Exam books which have Construction Engineering added. If u order, u can use promotion code ENGTXP at the shopping cart to get 15% off
  13. C

    is CERM enough for WR afternoon?

    In Hydraulics, beside basic stuff like Hazen-William or Darcy formula for single pipe, basic open channel, basic pump operation, head loss, minor loss, etc., there are topics such as pipe net work (pipes in series, in parallel, Hardy-Cross), pipe bend, back water curve...you need to pay...
Back
Top