Welcome to New Jersey

Professional Engineer & PE Exam Forum

Help Support Professional Engineer & PE Exam Forum:

This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.
I always think of him as FMLMike. 
And yes today, FML because I am standing here watching a hole drain in 28 degree weather.

4851a796e69adf684aa69621b3da60a8.jpg


 
That is correct. Open bottom, perforated bucket with 1" graduations
5-gallon bucket? How deep do you have to run your perc test? Over here, we need to be a minimum of 36" (frost depth).
State code calls for 12" test. It's for the select fill in the bottom of septic bed so the chances of frost occurring at the time of the test are slim.

 
Nice. I like that system...I might have to come up with something similar (but to account for depth) in our office. I usually just use a survey stake placed over the hole and a tape.

 
Back
Top