Engineer22
Well-known member
- Joined
- Aug 12, 2017
- Messages
- 89
- Reaction score
- 1
spacing?
Last edited by a moderator:
Don't forget shear - that can often control slabs and footings. I usually start with minimums (by span, ACI, AASHTO) then check shear, then moment - both for ultimate strength and minimum moment, then rebar spacing (crack control), then any other provisions. This order usually reduces any rework due to a later check failing and making me iterate.If you have a one way concrete slab, is the thickness sized by bending moment, deflection, loading duration, or rebar spacing?
I always check code first. After that I move on to shear and moment capacity. Either way, you have to check everything.Is it usually determined by one of those factors primarily, or first? What is checked first?
I understand. Thanks so much to you, and everyone in this helpful forum!I always check code first. After that I move on to shear and moment capacity. Either way, you have to check everything.
Enter your email address to join: