I am designing a 15" thick rigid pavement. The govering crane outrigger load is about 200 kips on 1.5' x 1.5' area. How do I decide whether I need both top & bottom reinforcement or only top reinf. is good enough? I would really appreciate your response. Thanks
if anything you would only need bottom reinforcement under the outrigger pad because bending would cause tension on the bottom and not the top.
Also for a concentrated load like that you need to check punching shear so the outribber doesn't just go through your slab.
you say "rigid pavement". Is this a slab on grade? What is the supporting material below the slab? how stiff is it? how well compacted?
What is it's bearing capacity?
In other words, how long a span do you need to carry the 200kips for?
Is that 200k a working load or a factored ultimate load?