Hello my fellow engineers! I'm looking for help on writing a letter to the California Board of Professional Engineers, Land Surveyors, and Geologists. My application for a Civil PE license was shot down on the grounds that there wasn't enough info to determine the work as civil engineering under their definition. Two lines is hardly enough room to describe everything I did and I was suckered into thinking that maybe they didn't care too much about it, but here I am now. Can you help me buff up the appeal letter?
Dear X:
I am a recent applicant for licensing as a Professional Civil Engineer sitting for the April 2013 exams. In a letter dated January 31, 2013, I received the Board’s determination that my application would be classified as incomplete. In response, I submit this letter further detailing my engagement period with Company X. Please accept this additional information to supplement the Engagement Record and Reference Form used to determine if my engagement would qualify as Engineering Experience under the Board’s definition.
The only project during my engagement period was the Project X: Radiological Remediation and Support which lasted from my date of hire, November 1, 2010, to the deadline of the April 2013 exam application, November 1, 2012. Its purpose was to protect the public health and welfare, and the environment from actual or potential releases of radiological contaminants with the removal of sewer and stormwater drainage piping, materials, and soil in the area that was found to contain contamination. The piping, the trenches resulting from the piping removal, the surrounding soil, and nearby buildings were screened and sampled for their specific physical quality of radiological concern. Additional excavation remediation was performed as necessary. All materials that were determined to have contamination were properly disposed of. Site restoration activities included the installation of a temporary drainage swale to manage overland storm water flow. In addition, trench excavations were backfilled to grade followed by the application of road base material.
Below I have organized a table listing my tasks and duties in contribution to the project in detail and a corresponding engineering principle beside each.
[Note: I was having too much trouble formatting a table into this post so I attached it just as a Word file instead.]
If you have any further questions or need any additional information, please call me at XXX-XXXX or email [email protected].
Sincerely,
nlook
Appeal letter table.doc
Dear X:
I am a recent applicant for licensing as a Professional Civil Engineer sitting for the April 2013 exams. In a letter dated January 31, 2013, I received the Board’s determination that my application would be classified as incomplete. In response, I submit this letter further detailing my engagement period with Company X. Please accept this additional information to supplement the Engagement Record and Reference Form used to determine if my engagement would qualify as Engineering Experience under the Board’s definition.
The only project during my engagement period was the Project X: Radiological Remediation and Support which lasted from my date of hire, November 1, 2010, to the deadline of the April 2013 exam application, November 1, 2012. Its purpose was to protect the public health and welfare, and the environment from actual or potential releases of radiological contaminants with the removal of sewer and stormwater drainage piping, materials, and soil in the area that was found to contain contamination. The piping, the trenches resulting from the piping removal, the surrounding soil, and nearby buildings were screened and sampled for their specific physical quality of radiological concern. Additional excavation remediation was performed as necessary. All materials that were determined to have contamination were properly disposed of. Site restoration activities included the installation of a temporary drainage swale to manage overland storm water flow. In addition, trench excavations were backfilled to grade followed by the application of road base material.
Below I have organized a table listing my tasks and duties in contribution to the project in detail and a corresponding engineering principle beside each.
[Note: I was having too much trouble formatting a table into this post so I attached it just as a Word file instead.]
If you have any further questions or need any additional information, please call me at XXX-XXXX or email [email protected].
Sincerely,
nlook
Appeal letter table.doc
Attachments
Last edited by a moderator: