Depends on if the contractor left the cost impact field blank or not.
The last contractor that did that on one of my projects was informed in writing by the owner that a blank impact field on their RFI's meant no impact. The owner would check NO, initial it and then return it after it was reviewed by the design team.

After the contractor had to eat about a 15k change, he made sure everyone filled out the RFI's correctly.
 