new_at_this
Well-known member
For temporary traffic control during construction, there are formulas to use to determine Taper length (for example, Taper length = W*S; where, W= Offset length, S = Posted speed limit).
My question is how you determine the offset length? Say, I am putting sign for working on a 12 ft wide lane; if I want to close that lane using traffic control signs, should I use offset length = 12 ft?
Please help me understand.
My question is how you determine the offset length? Say, I am putting sign for working on a 12 ft wide lane; if I want to close that lane using traffic control signs, should I use offset length = 12 ft?
Please help me understand.