i'm having an issue on this problem. I am being told that this condition leads to a "pinned" connection of the column to the stem wall. (there are also ties along length of column)
My issue with this is that a) wouldn't the couple forces within the column inherently make this moment resistive? b) would section b-b be equal or greater in strength than section a-a? surely one can't assume a pinned connection anywhere along the column.
assuming you can only consider this pinned, how would the rebar placement need to be changed in order to make the column/stem-wall interface a moment resistive element?
My issue with this is that a) wouldn't the couple forces within the column inherently make this moment resistive? b) would section b-b be equal or greater in strength than section a-a? surely one can't assume a pinned connection anywhere along the column.
assuming you can only consider this pinned, how would the rebar placement need to be changed in order to make the column/stem-wall interface a moment resistive element?