Determine the LOS on a regular weekday on a 0.40-mi section of a six-lane freeway with a grade of 2 percent, using the following data:
Hourly Volume, v= 3000 veh/h
PHF= 0.85
Traffic Composition:
Trucks= 12%
RV's= 2%
Lane Width= 11 ft
Terrain= level
Base free-flow speed= 70 mph
Shoulder width= 6 ft
Interchange spacing = 1 mile
Driver population adjustment factor fp= 1
Good Luck!!