I think this should be easy but for some reason I can't remember how to do this.
Generator A has a capacity of 3MVA with an impedance of 3%, generator B has a capacity of 4MVA with an impedance of 2%. Gen A&B are syncronized and operating in parallel. What is the max load Gen B can handle in this configuration without overloading an generators? Thanks.
Generator A has a capacity of 3MVA with an impedance of 3%, generator B has a capacity of 4MVA with an impedance of 2%. Gen A&B are syncronized and operating in parallel. What is the max load Gen B can handle in this configuration without overloading an generators? Thanks.