Playground Mech
New member
- Joined
- Jun 6, 2019
- Messages
- 1
- Reaction score
- 0
I was wondering if someone might be able to make sure that I am on the right track.
Attached is a picture of a free standing tire swing and I am planning on adding stifferns at the bottom to stop the twisting.I am thinking that I will use 2 - 4" Square Tubing x 12" and 3/8" carbon plate with 3/4 Hilti Anchors and Expoy.
Would that be enough support to help keep it from twisting? These stiffners will be at the top of the concrete. I will place the swing 3 or 4 feet in the ground with a 3.5'x3.5'x3.5' hole full of concrete.
I hope this is enough information to help get pointed in the right directions.
thanks,
View attachment 2019-06-06 11-06.pdf
Attached is a picture of a free standing tire swing and I am planning on adding stifferns at the bottom to stop the twisting.I am thinking that I will use 2 - 4" Square Tubing x 12" and 3/8" carbon plate with 3/4 Hilti Anchors and Expoy.
Would that be enough support to help keep it from twisting? These stiffners will be at the top of the concrete. I will place the swing 3 or 4 feet in the ground with a 3.5'x3.5'x3.5' hole full of concrete.
I hope this is enough information to help get pointed in the right directions.
thanks,
View attachment 2019-06-06 11-06.pdf