In example 4.31 of the SERM (Design of Splice connection) Ae is taken equal to An but in AISC it is given as Ae = UAn.
I was thinking that in that example, case 1 where U = 1 applies.
I wanted to make sure that for tension splice on the flange of W section, case 2 or case 7 would apply. Am I correct?
Thanks for your time.
I was thinking that in that example, case 1 where U = 1 applies.
I wanted to make sure that for tension splice on the flange of W section, case 2 or case 7 would apply. Am I correct?