• If you have bought, sold or gained information from our Classifieds, please donate to EngineerBoards and give back.

    You can become a Supporting Member or just click here to donate.

Construction Afternoon References

Professional Engineer & PE Exam Forum

Help Support Professional Engineer & PE Exam Forum:

This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.

EnvEngineer

Well-known member
Joined
Feb 23, 2009
Messages
446
Reaction score
1
Location
California
This is what is left of a great collection of references essential to passing the construction afternoon. The books were used by NCEES to develop their Construction Afternoon sample problems. All are like new purchased for the October Exam

All Include shipping

You can use a Credit Card with Paypal or we can work out something.

[email protected]

ASD/LRFD 2005 Edition (Single Wood Strength Reference Book), $25.00

ASD/LRFD 2005 Edition (Full set 4 books), $110.00

ACI 318-05: Building Code Requirements for Structural Concrete $110.00

ASCE 37-02 Design Loads on Structures during Construction 30$

Project Management for Engineering and Construction, Oberlender $35.00

Detailed cost and project analysis for project managment

Construction Planning and Scheduling, 2nd edition, Hinze $45.00

Very Detailed CPM

Civil PE Construction Module, Ruwan $35.00

Essential supplement to CERM 11

 
Here is what is left.

ASD/LRFD 2005 Edition (Full set 4 books), $110.00

ASCE 37-02 Design Loads on Structures during Construction 30$

Project Management for Engineering and Construction, Oberlender $35.00

Detailed cost and project analysis for project managment (Reference from NCEES Construction Practice Exam)

Construction Planning and Scheduling, 2nd edition, Hinze $45.00

Very Detailed CPM (Reference from NCEES Construction Practice Exam)

Civil PE Construction Module, Ruwan $35.00

Essential supplement to CERM 11 Ruwan with all its imperfections has 4 sections that are really needed for the exam, project cost analysis, project scheduling, dig and haul, and temporary structures

 
Back
Top