for this problem: single phase system.
At load side: 3.3KV, 75KW @ 0.9 PF lagging.
Z feeder to load = 0.2 + j0.5. Find V at source?
In the solution:
1- I = P/(V*PF) = 25.3 @ theta= -25.8
2- V source = IZ + V load and the answer 3010
since it is single phase system: shouldn't V source = 2IZ + V load? and V= 3020
At load side: 3.3KV, 75KW @ 0.9 PF lagging.
Z feeder to load = 0.2 + j0.5. Find V at source?
In the solution:
1- I = P/(V*PF) = 25.3 @ theta= -25.8
2- V source = IZ + V load and the answer 3010
since it is single phase system: shouldn't V source = 2IZ + V load? and V= 3020