I am a Geotech looking at the AM transpo problems and have run into two issues. The first is a general question.
1) When determinig LOS, I go into the HCM charts with the corrected flow rate based on heavy vehicles and such and also with a corrected free flow speed (ffs). When applying the corrections to the FFS, I may end up with a value like 62 mph. In this case, is there a rule that you round up or down (60 vs. 65) or do you try to interpolate between the 60 mph and 65 mph rows in the HCM?
2) This is similar to a sample problem that I saw. I have only had one transpo class but have NEVER done anything like this. I see the description of how to handle this in the HCM but can't decode the info enough to make it through. Can someone work this one out so that a Geo could understand it? Also, is this something that *could* show up in the AM anyway?
Determine the LOS for this lane group:
Isolated Signalized Intersection
Adjusted volume = 120 vph
Adjusted Saturation Flow = 900 vph
Cycle Length = 90 seconds
Effective green time = 20 seconds
Unit Extension = 3 seconds (what is this??)
Negligible residual demand delay
Anyone?
THanks!
GT
1) When determinig LOS, I go into the HCM charts with the corrected flow rate based on heavy vehicles and such and also with a corrected free flow speed (ffs). When applying the corrections to the FFS, I may end up with a value like 62 mph. In this case, is there a rule that you round up or down (60 vs. 65) or do you try to interpolate between the 60 mph and 65 mph rows in the HCM?
2) This is similar to a sample problem that I saw. I have only had one transpo class but have NEVER done anything like this. I see the description of how to handle this in the HCM but can't decode the info enough to make it through. Can someone work this one out so that a Geo could understand it? Also, is this something that *could* show up in the AM anyway?
Determine the LOS for this lane group:
Isolated Signalized Intersection
Adjusted volume = 120 vph
Adjusted Saturation Flow = 900 vph
Cycle Length = 90 seconds
Effective green time = 20 seconds
Unit Extension = 3 seconds (what is this??)
Negligible residual demand delay
Anyone?
THanks!
GT