Question from Cuomo book.

Professional Engineer & PE Exam Forum

Help Support Professional Engineer & PE Exam Forum:

This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.

sue

New member
Joined
Feb 1, 2008
Messages
1
Reaction score
0
Hi all,

I have been studying the cuomo book and work out problems. I have a question on problem 8 chap. 3. How is the HI at TP1 calculated? attached is the problem and solution. Thanks!

 
454.69+4.02 = 458.71 = HI BM1

458.71 - 6.02 (FS TP1) = 452.69 = Elev TP1

452.69 + 4.20 (BS TP1) = 456.89 = HI TP1

Don't start too early, you'll burn out!

Hi all,
I have been studying the cuomo book and work out problems. I have a question on problem 8 chap. 3. How is the HI at TP1 calculated? attached is the problem and solution. Thanks!
 
454.69+4.02 = 458.71 = HI BM1
458.71 - 6.02 (FS TP1) = 452.69 = Elev TP1

452.69 + 4.20 (BS TP1) = 456.89 = HI TP1

Don't start too early, you'll burn out!

Just wanted to mention that one should not care the SS readings when calculate HI. Good luck!

 
Back
Top