I hate these borrow problems...here is what I did rather quickly, someone correct me if I wander from what I should have done...
In place needs to be 108 at 14.5% UWd=108pcf
Borrow material, properties given...UWd=(Gs*UWwater)/(1+e)=79.63pcf
Ratio = 108/79.63 = 1.362 (need about 36.2% more)
Volume Required = 82,500 ft3 for 100 LF of embankment
Borrow Volume = Vreqd * ratio = 82,500 * 1.362 = 112,365 ft3 /27 = 4,162 yd3
(A)
I did this one wrong the first time and adjusted the unit weight of the embankment by the MC which does not need to be done since they give you UWd.
-GT