okay were finally biting the bullet and going to finish our basement..
getting prices for HVAC & Plumbing right now,, not a lot of fun making calls, but thats my job as part time GC
So I am doing some myself, some sub-contracted like the HVAC, plumbing, sheetrock (ceiling as well)
My budget is $12K for about 1,000 SF, all the walls are framed in and one room is already sheetrocked from the original builder, but its needs some touch up work
First thing up for me this weekend, I need to install a sub-panel for the HVAC, 100 Amp Sub-Panel. I have installed circuit breakers and new lines from the main panel before, what I have read adding a sub-panel is a lot like adding breakers? Nead you guys to reasure me that I can do this Or encourage me to pay a few hundred bucks to have a proffessional do it?
Heres my schedule:
HVAC
Plumbing (rough in for bar, and full bath)
Electircal rough in
Sheetrock
painting
flooring
stripper pole installation
crazy disco party (your all invited)
will get some in progress pics done along the way!
getting prices for HVAC & Plumbing right now,, not a lot of fun making calls, but thats my job as part time GC
So I am doing some myself, some sub-contracted like the HVAC, plumbing, sheetrock (ceiling as well)
My budget is $12K for about 1,000 SF, all the walls are framed in and one room is already sheetrocked from the original builder, but its needs some touch up work
First thing up for me this weekend, I need to install a sub-panel for the HVAC, 100 Amp Sub-Panel. I have installed circuit breakers and new lines from the main panel before, what I have read adding a sub-panel is a lot like adding breakers? Nead you guys to reasure me that I can do this Or encourage me to pay a few hundred bucks to have a proffessional do it?
Heres my schedule:
HVAC
Plumbing (rough in for bar, and full bath)
Electircal rough in
Sheetrock
painting
flooring
stripper pole installation
crazy disco party (your all invited)
will get some in progress pics done along the way!