B
Blu1913
freakin equipotential lines and seepage under a dam with the head loss equal to the amount of drop and the consliation in inches to be able to find the T factor and the placement of fill with the effective stress used for cohesive soils and the BODu calcualted using the time factor for deoxygenation while the stream sufffers from a lack of DO with the horizontal curve using the coordinate to fin PC on the spiral with a minimum spiral lenght to not cause discomfort and the ATR reading to find the vehilces per year of the ADT for and LOS of E.
holy sh!t guys, i think im losing it.... ^------ WTF!!! :w00t: :suicide:
holy sh!t guys, i think im losing it.... ^------ WTF!!! :w00t: :suicide: