Hi,
I recently got NJ PE License and I am trying to acquire NY PE license.
When I called NY PE Board, they told me I have to submit Form 1, 2, 3, 4 & 4A since I don't have NCEES record.
Is there an easy way to go about it?
Thanks,
Three Questions,
1. Is there a negative impact in terms of delays (relative term, folks) for having PCS as a middle man?
2. Where should I look for my results, NCEES or PCS website?
3. In relation to other states that don’t utilize PCS, do NJ results come before or after other...
31. Homework Problem ‐ A freeway ramp has the following characteristics:
Radius on inner edge of pavement equals 100 ft.
One‐lane, one‐way operation with no provisions for passing a stalled vehicle
Design traffic Condition A
Barrier curb on both sides
The ramp pavement width needed (ft) is...
This is a question from my School of PE Class -
A manufacturer plans to build a new plant on SR 39, which is a windy, four‐lane, undivided highway in the hills west of town. The plant will generate a significant amount of combination truck traffic. SR 39 has a design speed of 50 mph. In...
Concrete Bridge Protection, Repair, and Rehabilitation Relative to
Reinforcement Corrosion is performed by a contractor at a cost rate of
$38.65/SF. Sixteen out of thirty-eight, 8-ft diameter columns have been
determined by the resident engineer needing this work. The surface area
extends from...
Shoulder work needs to be completed on a freeway. The 85th percentile speed is 65 MPH and the offset required is 18 ft. How far in advance of the first cone should a drive see the first "Right Side Shoulder Closed" sign?
A. 1000 ft.
B. 1500 ft.
C. 1890 ft.
D. 2890 ft.
Could someone please...