  1. N

    NCEES practice test problem 508

    508) A construction crew of six can form 48 ft2 of contact area per crew-hour when working at less than 8 ft above grade. At more than 8 ft above grade, the production rate drops 40%. Assuming a crew cost of $372/hr, the labor cost to form walls for a 40 ft long x 90 ft wide x 14 ft tall free...
  2. N

    NCEES has released the 2015 exam outlines

    construction. I bought the construction depth package (which includes 6 minute construction problems) but now I'm looking at buying Practice Problems for the Civil Engineering PE Exam: A Companion to the Civil Engineering Reference Manual (CEPP14) for more practice problems.
  3. N

    NCEES has released the 2015 exam outlines

    OK thanks guys. Aside from the CERM and NCEES practice test how much other material did you acquire to study for the morning session?
  4. N

    NCEES has released the 2015 exam outlines

    I bought the CERM for the morning session and have been going through it. I'm wondering if anyone else has been going through it and come across sections that we could eliminate needing to study from the book based on the new 2015 exam outlines?