/\For me personally, it would be useless. We don't do anything with LEED here.
LMAOO!! Alright I'm getting the impression of "wait till your boss tells you to get one". Thanks everyone!Quiet down Mike, the adults are talking.
I'm all of your worst nightmares...
but really, it just depends on what your goal is...
I'm a LEED AP BD+C. I really only used it while I was working for the US. Army Corps of Engineers doing Project Management over construction of LEED Silver and Gold buildings on base. I work for a water/wasterwater utility now and there is no use for LEED in utilities.
90% of the time the specs called for the building (new and renovation) to meet LEED certifiable standards but in some instances it is a betterment that the DB firm put forward or was specifically asked for by using organization. For example there was a LEED Silver certified school gymnasium that was built on base because DODEA/DDESS required it. There was a Blood Donor Center that the DB firm offered to certify the building LEED Gold as part of their betterments when they submitted their RFQ submittal. I don't know about now but three years ago, that's what USACE was requiring on their MILCON and certain OMA work.I'm a LEED AP BD+C. I really only used it while I was working for the US. Army Corps of Engineers doing Project Management over construction of LEED Silver and Gold buildings on base. I work for a water/wasterwater utility now and there is no use for LEED in utilities.
I'm curious as to where you were working. My experience was that they don't actually register anything into the LEED website unless the contractor desires to. The requirements were there but as long as the checklist was met it would never go to the final stages.
90% of the time the specs called for the building (new and renovation) to meet LEED certifiable standards but in some instances it is a betterment that the DB firm put forward or was specifically asked for by using organization. For example there was a LEED Silver certified school gymnasium that was built on base because DODEA/DDESS required it. There was a Blood Donor Center that the DB firm offered to certify the building LEED Gold as part of their betterments when they submitted their RFQ submittal. I don't know about now but three years ago, that's what USACE was requiring on their MILCON and certain OMA work.I'm a LEED AP BD+C. I really only used it while I was working for the US. Army Corps of Engineers doing Project Management over construction of LEED Silver and Gold buildings on base. I work for a water/wasterwater utility now and there is no use for LEED in utilities.
I'm curious as to where you were working. My experience was that they don't actually register anything into the LEED website unless the contractor desires to. The requirements were there but as long as the checklist was met it would never go to the final stages.
90% of the time the specs called for the building (new and renovation) to meet LEED certifiable standards but in some instances it is a betterment that the DB firm put forward or was specifically asked for by using organization. For example there was a LEED Silver certified school gymnasium that was built on base because DODEA/DDESS required it. There was a Blood Donor Center that the DB firm offered to certify the building LEED Gold as part of their betterments when they submitted their RFQ submittal. I don't know about now but three years ago, that's what USACE was requiring on their MILCON and certain OMA work.I'm a LEED AP BD+C. I really only used it while I was working for the US. Army Corps of Engineers doing Project Management over construction of LEED Silver and Gold buildings on base. I work for a water/wasterwater utility now and there is no use for LEED in utilities.
I'm curious as to where you were working. My experience was that they don't actually register anything into the LEED website unless the contractor desires to. The requirements were there but as long as the checklist was met it would never go to the final stages.
DODEA/DDESS I will agree with but the schools are an individual entinity within the system, they have to meet individual post standards but usually exceed them in meeting their own standards, but I'm going to disagree with you for MILCON (I wasn't involved in too much OMA work until the end so I don't have as much experience with it), but the RFP's don't require that the projects actually be certified, it only states that they need to meet the requirements on the checklist. The projects are not going to go through the process unless the contractor pushes them through and pays for the certification. Out of all the projects that I worked on, I can only think of two contractors that actually went through and were aiming for it, and I'm not even sure that they got it (and I'm talking about more than two years ago as well)
90% of the time the specs called for the building (new and renovation) to meet LEED certifiable standards but in some instances it is a betterment that the DB firm put forward or was specifically asked for by using organization. For example there was a LEED Silver certified school gymnasium that was built on base because DODEA/DDESS required it. There was a Blood Donor Center that the DB firm offered to certify the building LEED Gold as part of their betterments when they submitted their RFQ submittal. I don't know about now but three years ago, that's what USACE was requiring on their MILCON and certain OMA work.I'm a LEED AP BD+C. I really only used it while I was working for the US. Army Corps of Engineers doing Project Management over construction of LEED Silver and Gold buildings on base. I work for a water/wasterwater utility now and there is no use for LEED in utilities.
I'm curious as to where you were working. My experience was that they don't actually register anything into the LEED website unless the contractor desires to. The requirements were there but as long as the checklist was met it would never go to the final stages.
DODEA/DDESS I will agree with but the schools are an individual entinity within the system, they have to meet individual post standards but usually exceed them in meeting their own standards, but I'm going to disagree with you for MILCON (I wasn't involved in too much OMA work until the end so I don't have as much experience with it), but the RFP's don't require that the projects actually be certified, it only states that they need to meet the requirements on the checklist. The projects are not going to go through the process unless the contractor pushes them through and pays for the certification. Out of all the projects that I worked on, I can only think of two contractors that actually went through and were aiming for it, and I'm not even sure that they got it (and I'm talking about more than two years ago as well)
And I agree with you. 95% of the projects only required for them to meet the requirements on the checklist. Only a few actually went through the process to get certified.
If you look online in the LEED database for projects on military bases certified LEED Silver and Gold, you will find a lot that have gone through the process to get LEED certified.
You do realize that you contradicted yourself? And considering the volume of projects, I don't really see a lot that have gone through the process. Regardless of that, it's not a requirement for the majority of projects.
There are at least a dozen buildings on Fort Benning that have gone through the process and gotten LEED Certified.