Tried to change the title, but didn't see how. This proposal/project is in Central Florida. It is a proposal for design for improvements to the intersection of University and Goldenrod.
In order to fulfill the requirements for a proposal my company is putting together for Orange County, FL we need to supply two individuals with specific qualifications.
Project Manager and Project Engineer requirements:
"Similar Project" for the purpose of the Request for Proposal for the University Boulevard at Goldenrod Road Intersection Improvements final design project has been defined as a road project successfully completed within the 15 years immediately preceding the submittal date of this Request for Proposal and containing the following elements:
In addition to the point consideration above, at least one of the projects submitted must contain Element five (5); and at least one of the projects submitted must contain element seven (7). If one of the submitted projects does not include Element 5 and 7, then no credits will be given for that project.
To be credited as similar projects for the particular Project Manager that individual must have served as either the Project Manager or Project Engineer on two (2) of the similar projects listed for a substantial majority of the project activities and duration. To be credited as similar projects for each of the remaining three (3) similar projects listed the individual must have served as Project Manager for a substantial majority of the project activities and duration.
To be credited as similar projects for the particular Project Engineer that individual must have served as the Project Manager, Project Engineer or Design Engineer on two (2) of the similar projects listed for a substantial majority of the project activities and duration. To be credited as similar projects for each of the remaining three (3) similar projects listed the individual must have served as Project Manager or Project Engineer for a substantial majority of the project activities and duration.
Substantial majority shall be defined as 70% of the work.
The Proposer shall ensure that the basic description of the similar project, including all required performance requirements and/or dimensions are identified and that the elements are adequately explained in the text. The description shall document how the particular element was performed in conjunction with the overall project. The mere listing of elements without specific details in the body of the description will negatively impact the scoring for the project.
Failure to identify the specific performance requirements and/or dimensions of the project to ensure it meets the similar project description shall negatively impact that project's score.
Please email tmckeon_PE@f'tard.com if you are interested. If you qualify and are chosen, a Letter of Intent will be initiated and will be included with the proposal. This proposal is due by July 31st, 2007, so time is of the essence.
Thanks.
In order to fulfill the requirements for a proposal my company is putting together for Orange County, FL we need to supply two individuals with specific qualifications.
Project Manager and Project Engineer requirements:
"Similar Project" for the purpose of the Request for Proposal for the University Boulevard at Goldenrod Road Intersection Improvements final design project has been defined as a road project successfully completed within the 15 years immediately preceding the submittal date of this Request for Proposal and containing the following elements:
- 1. Design of a multi-lane urban roadway having a minimum length of 0.5 miles and a design fee equal to or greater than two hundred and fifty thousand dollars ($250,000.00). For purposes of this Request for Proposal, "urban" is defined as projects with either open or closed drainage or a combination thereof, which traverse an urbanized area with multiple intersecting streets and connecting driveways, and multi-lane is defined as having four or more lanes. Credit shall not be given for limited access roads.
- 2. Permitting for drainage facilities (must include preparation of application and receipt of permit from the regulatory authority.
- 3. Preparation of bid documents (must include both final construction plans and technical specifications). Projects where the technical specifications were prepared by the Owner or by individuals not employed by the consultant or his sub-consultants are not acceptable and will result in no points being awarded.
- 4. Preparation of legal descriptions
- 5. Design of a roadway containing the intersection of two multi-lane roadways. Multi-lane is defined as having four or more lanes.
- 6. Preparation of a design survey.
- 7. Preparation of signalization plans.
- 8. Preparation of maintenance of traffic plans.
- 9. Utility coordination and adjustment plans.
In addition to the point consideration above, at least one of the projects submitted must contain Element five (5); and at least one of the projects submitted must contain element seven (7). If one of the submitted projects does not include Element 5 and 7, then no credits will be given for that project.
To be credited as similar projects for the particular Project Manager that individual must have served as either the Project Manager or Project Engineer on two (2) of the similar projects listed for a substantial majority of the project activities and duration. To be credited as similar projects for each of the remaining three (3) similar projects listed the individual must have served as Project Manager for a substantial majority of the project activities and duration.
To be credited as similar projects for the particular Project Engineer that individual must have served as the Project Manager, Project Engineer or Design Engineer on two (2) of the similar projects listed for a substantial majority of the project activities and duration. To be credited as similar projects for each of the remaining three (3) similar projects listed the individual must have served as Project Manager or Project Engineer for a substantial majority of the project activities and duration.
Substantial majority shall be defined as 70% of the work.
The Proposer shall ensure that the basic description of the similar project, including all required performance requirements and/or dimensions are identified and that the elements are adequately explained in the text. The description shall document how the particular element was performed in conjunction with the overall project. The mere listing of elements without specific details in the body of the description will negatively impact the scoring for the project.
Failure to identify the specific performance requirements and/or dimensions of the project to ensure it meets the similar project description shall negatively impact that project's score.
Please email tmckeon_PE@f'tard.com if you are interested. If you qualify and are chosen, a Letter of Intent will be initiated and will be included with the proposal. This proposal is due by July 31st, 2007, so time is of the essence.
Thanks.