Search results

Professional Engineer & PE Exam Forum

Help Support Professional Engineer & PE Exam Forum:

This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.
  1. C

    HydroCAD Modeling assistance - subsurface infiltration bed

    I am trying to model a subsurface facility that works in conjunction with a detention pond. The goal was to utilize as small of a bed as possible to receive runoff from about 2 acres, infiltrate the 2-yr, and then let the rest of the water flow out to Basin 1, which provides rate control. The...
Back
Top