  1. L

    Problem from PE Review.net, Tie capacity

    I have been mulling over this problem solution for a while and cannot sort it. Problem statement: "A retaining wall is constructed by pouring concrete between temporary wood forms. The concrete is at 70EF, has a setting time of 11/2 hr, and is placed at a rate of 2ft per hr. The wall...