I have been mulling over this problem solution for a while and cannot sort it.
Problem statement:
"A retaining wall is constructed by pouring concrete between temporary wood forms. The concrete is at 70EF, has a setting time of 11/2 hr, and is placed at a rate of 2ft per hr. The wall...