Search results

Professional Engineer & PE Exam Forum

Help Support Professional Engineer & PE Exam Forum:

This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.
  1. petrographer77

    AASHTO 2010 Interim Revisions

    Are the 2010 Interim Revisions required for the AASHTO LRFD design standard? The NCEES Civil-Structural list of Design Standards does not make note them. However, the NCEES Structural Exam notes, "The 2010 Interim is not required." Why they left this off the Civil-Structural list I have no idea.
  2. petrographer77

    Prob 521 NCEES Civil: Structural Sample Exam

    Any idea why they did not incorporate Cb in the problem? When I saw the beam diagram with the off center point load I thought for sure they wanted me to incorporate it. Is it simply because the max moment occurs away from the brace point? Any help would be appreciated
Back
Top