Are the 2010 Interim Revisions required for the AASHTO LRFD design standard? The NCEES Civil-Structural list of Design Standards does not make note them. However, the NCEES Structural Exam notes, "The 2010 Interim is not required." Why they left this off the Civil-Structural list I have no idea.