Search results

Professional Engineer & PE Exam Forum

Help Support Professional Engineer & PE Exam Forum:

This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.
  1. C

    WASHINGTON, WA - RESULTS

    I can't wait either.... getting so anxious... I felt pretty good about the exam right after I took it but now just feeling really unsettlling... I think I might fail... :'(
  2. C

    Difficult Vertical Curve problem

    Q-13:Let x be the station of PI: Eleveation of PI can be expressed by 2 expressions which we can make an equation to solve for x: 240.6-2.5(x-20.10)=243.30-1.5(30.30-x)--> solve for x=23.25 so station of PI is 23+25 Answer is B Q-14: Substitute x into either side of the equation above to...
  3. C

    Six Minute Solutions - Water Resources Breadth #10

    Here is the problem: A concrete-lined open channel is used to convey storm water runoff along a roadway. The roadway and channel make an abrupt transition from 12% slope to 2% slope, which causes a hydraulic jump to form. The channel is a triangular cross section and 1-to-1 side slopes. The...
  4. C

    Six Minute Solutions - Water Resources Breadth #10

    Thanks for much for your response! I applied both continuity and momentum and reached the result of 0.28. However, if I plug that back into the continuity equation it doesn't balance, however. The momentum equation as used in the solution doesn't take into account the second slope - S2 isn't...
  5. C

    Six Minute Solutions - Water Resources Breadth #10

    I am trying to work through the six-minute solution problems, WR and got stuck on #10 breadth. I think using the Continuity equation (A1*V1 = A2*V2) is enough to solve the problem (I arrive at .14), but my answer doesn't match with any of the answers in the provided solution (which is .28). I...
  6. C

    PE books of CA exam for sale (Civil)

    Hello - I sent you a PM about the books.
Back
Top