Search results

Professional Engineer & PE Exam Forum

Help Support Professional Engineer & PE Exam Forum:

This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.
  1. I

    "Fully Developed" Hydrological Design Criteria

    Hi I was curious to see if anyone could list (or provide links) the pros and cons of using "fully developed" design criteria for storm water and hydrological systems design. "Fully developed: is defined as all area that has been zoned to be developed within a watershed. Thanks, Siva
  2. I

    When will the results be out ?

    I took the October PE Exam. I am hearing that the results will be out before Christmas. Can someone provide more information? Thanks!
Back
Top