Search results

Professional Engineer & PE Exam Forum

Help Support Professional Engineer & PE Exam Forum:

This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.
  1. C

    Test day approaching

    I thought I would share some thoughts with the test date approaching. - One of my guys is taking the test and I had him down on the schedule for the wrong Friday off. Check to make sure you have the appropriate date blocked off on your calendar (and with your employer). Test day tips: -...
  2. C

    Design tables not allowable?

    I am going through the Kaplan exam prep, and Larry Novak just answered a question regarding interaction diagrams by saying that design tables are not permitted on the exam. Can someone please confirm or refute this? Thanks
  3. C

    "Unacceptable" vs. "Improvement Required"

    Does anyone care to speculate the differences between "Unaccceptable" vs. "Improvement Required" in relation to the SE Exam? My guess would be that, if the answer were "2 x 6", a 2 x 4 would render the answer "Unacceptable" and a 2 x 10 would be "Inprovement Required" with 2 x 6 and 2 x 8...
  4. C

    AISC 341

    I read an article published in STRUCTURE Magazine (September 2011) titled "Passing the New Structural Exam" that had exam prepatory advice. One of the tidbits of wisdom was "Be familiar with high seismic design requirements for all four building materials as defined in AISC 341, ACI 318 Chapter...
  5. C

    PE Study Materials

    Since I passed the exam on the first try, I thought I would offer my study materials (minus MERM) to someone who may need them. Included: (1) Questions and solutions book for MERM (1) Six Minute Solutions Machine Design (1) Six Minute Solutions Thermal & Fluids (1) NCEES Practice Exam...
Back
Top