Search results

Professional Engineer & PE Exam Forum

Help Support Professional Engineer & PE Exam Forum:

This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.
  1. V

    PE Result Dates by State

    WA (Geo) :D
  2. V

    Secondary compression

    I am not familiar with this problem. However, time factor (Tv) should be = cv*t/d^2. Also, if it is a single drainage case then the drainage path = d = total thickness of the compressibe stratum. For double drainage the drainage path = d = 1/2 of the thickness of the compressible stratum...
  3. V

    correction of N value

    You are correct Civilized_naah. That was my bad!
  4. V

    correction of N value

    Its psf or kPa.
Back
Top