The note under Table 9-5 states: ...or 0.7 s for trucks for each additional lane, from the left, in excess of one, to be crossed by the turning vehicle.
You have to read the whole statement. Yes you are crossing two lanes, but you only count one lane in your calculation. 0.7 s is correct.
Failed, civil construction, Colorado 49/80. I tanked Construction Operations and Methods and Material QualityControl and Production. AM structural was low as well as PM Other Topics, both 50%.
"in the interest of being EXTREMELY conservative I just looked up the cost of a fire hydrant install and subtracted the cost of a hydrant since they are just moving them. Apparently that's not good enough for our friendly native contractor"
The savings you think you should get for reusing the...