508) A construction crew of six can form 48 ft2 of contact area per crew-hour when working at less than 8 ft above grade. At more than 8 ft above grade, the production rate drops 40%. Assuming a crew cost of $372/hr, the labor cost to form walls for a 40 ft long x 90 ft wide x 14 ft tall free...
construction. I bought the construction depth package (which includes 6 minute construction problems) but now I'm looking at buying
Practice Problems for the Civil Engineering PE Exam: A Companion to the Civil Engineering Reference Manual (CEPP14) for more practice problems.
I bought the CERM for the morning session and have been going through it. I'm wondering if anyone else has been going through it and come across sections that we could eliminate needing to study from the book based on the new 2015 exam outlines?