  1. Kuku

    NORTH CAROLINA - RESULTS

    Results are up!
  2. Kuku

    NORTH CAROLINA - RESULTS

    Tick tock, tick tock, tick tock. :P Server crash anyone?!?
  3. Kuku

    NCEES streamlined process

    Simple solution: eliminate all humans. No curves, not cuts, no crap. Get X # correct and you pass and mister scantron will let you know when you walk out the door after the exam. This system is so antiquated it isn't funny. :sharkattack:
  4. Kuku

    Top Ten Things to do when you pass the PE

    Become your own boss.
  5. Kuku

    NEC 2008 or 2011

    Hah they adopt the newer codes faster than the majority of states.
  6. Kuku

    NORTH CAROLINA - RESULTS

    I've been eagerly awaiting results for my friend as you all have, and I must say that NCBELS / NCEES are horrifically slow this session getting results out to you guys. :smileyballs:
  7. Kuku

    NORTH CAROLINA - RESULTS

    You definitely will. Its always been before Christmas from what I've seen over the years.
  8. Kuku

    Fused, Non Fused, and Starter Disconnects

    It's usually a matter of coordinating with the mechanical engineer and a quick glance at the equipment cutsheets. Most of my work in the past few years the AHJ has required the mechanical contractor to provide the starter, disconnect etc. and it was on the EC to install and wire them. This is...
  9. Kuku

    KVA vs. KW for lighting

    In most cases the power factor will be negligible, so in the grand scheme of things if you are sizing your distribution equipment correctly, it will not matter if you use VA or W.
  10. Kuku

    NEC Code to Bring to Exam?

    You'd be OK with the 2005 version in my opinion. I don't believe they would ask questions that would have changed between the '05 and the '08. A lot of the questions will be looking things up in tables, which haven't changed in decades.
  11. Kuku

    Appendix B - Engineer's Statement

    I've been hunting for the correct verbage used on most electrical title sheets in North Carolina, under the Appendix B section. I've seen it on numerous jobs in the past but can't seem to find a copy. It's basically a designers statement that the engineer has to sign and date (underneath the...
  12. Kuku

    Does Anyone Else Feel This Way?

    I was about the third person to leave in the afternoon... I was pretty sure I failed the test. Lo and behold I passed. What's done is done and you shouldn't dwell on it. Good luck.
  13. Kuku

    277V Rated / 240V Provided

    For the sake of arguement, let's say that the lights were 400W metal halides, and there were quite a few of them. So you want to have as many of them as possible on the same circuit to avoid having to use larger lighting contactors, etc; thus powering them at 240V. The exit signs and emerg...
  14. Kuku

    277V Rated / 240V Provided

    Circuit is being provided from a 2-pole breaker in a panelboard that is 120/240 single phase.
  15. Kuku

    277V Rated / 240V Provided

    Question of the day: will a lighting unit (e.g. an exit sign) that is rated for dual voltage 120/277 work properly on a circuit that is 240V single phase? Good luck!