  1. I

    Slump test after adding Super P?

    6- Usually super p is added on site. The slump of concrete should be tested prior to the addition of super p. water should never be added once the super p is mixed
  2. I

    TEMPORARY STRUCTURES

    I got the Rattay book on Friday. At first look it seems to be a good reference for qualitative type of questions. A concrete text book I have (author aludes me at the moment and book is at office) has a great chapter on concrete formwork and supports. There is alot of reading to be done in the...
  3. I

    TEMPORARY STRUCTURES

    Cofferdams The following was from a Georgia manual on construction requirements for Cofferdams: 525.3.05 Construction A. Designing Cofferdams Cofferdams shall be structurally adequate to withstand external and internal forces including the following: 1. Forces and pressures from an...
  4. I

    2006 Most Frequently Cited OSHA Standards

    OSHA’s “Top 10” 1. Scaffolding OSHA standard 1926.451 requires employers to provide scaffolding at heights of 10 feet or more. An estimated 2.3 million construction workers, or 65 percent of the construction industry, work on scaffolds frequently. Protecting these workers from scaffold-related...
  5. I

    Crane Selection, Erection, and Stability

    Any insights on what types of questions would be generated from this? I can figure some of the stability questions. Maybe the other is qualitative.
  6. I

    Progressive Collapse

    Progressive Collapse of Reinforced Concrete Structures: A Multihazard Perspective http://findarticles.com/p/articles/mi_qa53...ag=artBody;col1
  7. I

    SCHEDULING

    http://cee.uiuc.edu/elrayes/Time-Cost-Quality.pdf Is this on track?
  8. I

    SCHEDULING

    SCHEDULING -- Approx. 17.5% of problems Construction Sequencing CPM Network Analysis Activity Time Analysis Resource Scheduling Time-Cost Trade-Off Any ideass on time-cost trade off typical problems?
  9. I

    TEMPORARY STRUCTURES

    TEMPORARY STRUCTURES -- Approx. 12.5% of problems Construction Loads Formwork False work and Scaffolding Shoring and Reshoring Concrete Maturity and Early Strength Evaluation Bracing Anchorage Cofferdams Codes and Standards: American Society of Civil Engineers (ASCE 37), American...
  10. I

    Progressive Collapse

    Any reference ideas for this?
  11. I

    Concrete Maturity and Early Strength Evaluation

    https://www.clemson.edu/t3s/workshop/2005/C...%20Maturity.pdf