maximus808
Well-known member
- Joined
- Mar 14, 2009
- Messages
- 249
- Reaction score
- 1
This has always confused me, when are we suppose to choose between the table method of trial and error S>L and L>S vs. the K value method based on speed for finding the minimum or required length of vertical curve? Thanks