Description: The CERM solutuon manual has an error on with Prob. #1 on Page 29-3. The answer is 135.6 lbm/day (1.4 MGD). Where did the 1.4 MGD come from in the final answer??
I hope you also asked this in the Civil forum, because those of us who took the enviro exam used the ENVRM, and don't have a copy of the CERM to be able to fully understand your question.