  1. McEngr

    SFRS for braced frame decks

    I'd be curious what system you guys use for SFRS in accordance with Table 12.2-1 of ASCE 7-10.  I tell engineers to design with a cantilevered column system, let the braces stiffen up the system if desired to do so or if needed, but use an R=1.5 per G.6.   Using an R=6.5 is incorrect, of course...
  2. McEngr

    Revit transfer to RISA and vice versa...

    Has anyone found success in transfterring from Revit to Risa? I have found all sorts of problems in the transfer - and I'm not optimistic that it will ever be nice. I'm a little concerned because the principal structural engineer may think it's an untapped benefit, and I hate to be the killer...
  3. McEngr

    AISC 341-10 errors

    Has anyone discovered any errors in the SCBF design example sections? I'm particularly concerned about some of the connection design issues between sheets 5-218 to 5-222. I felt very comfortable with the old AISC '-5 provision's examples, but the new formatting may have some errors in it - and...
  4. McEngr

    S1 in nonconstrained UBC 97 chapter 18 definition

    For what it's worth, I've completed lots of foundations for drilled piers and the like. However, I have been debating with a colleague whether the S1 in UBC 97 refers to 1/3 the embedment from the bottom of the embedment or the top of the embedment. Since this equation is rather difficult to...
  5. McEngr

    A Joke for Structural Engineers

    Rafael Sabelli on the latest AISC podcast has a joke that only us seismically-trained structurals would know. There was once a discussion among the SEAOC seismic committee on what response modification factor to give for an OCBF. There was a belief that one could use 5, but with the...
  6. McEngr

    Simpson TITEN HD ROD HANGER used as a Holdown?

    I've been wrestling with the idea of using a TITEN HD Rod Hanger as a holdown in a lightly-loaded (<2000# uplift) shearwall. I normally call out either SET-XP or AT-XP or Hilti HY150, yada yada... Anyone have an opinion here? I'm considering using the Simpson HDU2, HDU4, and HDU5 (among...
  7. McEngr

    Modal Analysis

    I got on eng-tips.com and asked this question with little success so far: Do I use rho if the dynamic analysis falls between the elf and elfxrho? ie: Vmodal = 137 kips Velfxrho = 167.4 kips (rho=1.3) velf = 128.8 kips I've not encountered a dynamic analysis in this scenario with section...
  8. McEngr

    Structural Engr Question:

    Do I use rho if the dynamic analysis falls between the elf and elfxrho? ie: Vmodal = 137 kips Velfxrho = 167.4 kips (rho=1.3) velf = 128.8 kips I'm a little new to dynamic analysis with section 12.6 of ASCE 7-10, so any corrections/comments are welcome. I'm using RISA
  9. McEngr

    2Ps on roof overhangs?...

    There once was a provision to double the roof snow (or flat snow?) on roof overhangs. Can someone point me to the code section? It's been a while since someone pressed me on the issue. I believe it was fairly obvious in IBC 2006, but things change so much that I can't remember... Possible...
  10. McEngr

    CA Civil Survey Review Course

    Can anyone recommend a CA Civil Survey Review Course for someone that has never performed a survey in his/her life? I am an SE looking to take the survey exam in the near future. Any recommendations and things to avoid etc would be greatly appreciated. Thanks!
  11. McEngr

    why does an SE need to have passed the survey exam?

    Can anyone tell me why a structural engineer would need to be qualified in surveying in order to be a practicing structural engineer? I could rant, but it's Friday. And I have a rule about Fridays...
  12. McEngr

    Surveying review books

    So, I bit the bullet and purchased the 3 survey reference materials on ppi2pass.com. I'm wondering if anyone has a recommendation of what else to study for for the CA Civil Survey test. I have the 3 mentioned on the following link...
  13. McEngr

    Revit Structure

    Well, our office just bought the whole Autodesk 2013 Suite, and it's daunting to say the least. We were just awarded a decent-sized project involving architects that only work with Revit consultants. (From personal experience - Revit and AutoCad don't mix) I was excited to import/export our...
  14. McEngr

    AASHTO LRFD Bridge Design Spec 5th Edition w/2010 Interim Revisions

    I'm selling my AASHTO 5th edition with the 2010 Interim Revisions still in the bound plastic. E-mail me at [email protected] if you're interested. I take money orders only. No paypal accepted. You can also order at Amazon.com - my seller profile is McGraw Engineering. Thanks, McEngr
  15. McEngr

    Are the SE Pass Rates what you expect?

    After noticing the last stated results for the NCEES 16 hour SE were around 45% and 46% for each exam component, I am curious what people feel about these results. Are the pass rates a statement of who's who or should it be easier? Thoughts?
  16. McEngr

    SE licensing in other states

    Has anyone applied for comity to other states from a civil PE to an PE+SE designation?
  17. McEngr

    Kevo - I guess we go a long way back?...

    http://forums.ppi2pass.com/Thread-Rayleigh-procedure-Question-for-seismic-SE-s Thought you'd be interested in an old post... ...good times. I was a blabbering idiot on the old forums. :)
  18. McEngr

    diagonal shear + overturning

    My boss asked me to check a vessel/hopper footing for shear and overturning at a 45 degree angle to the square footing. I tried to derive this, but it involves integration. Anyone have a quickie formula that I can use? Thanks. btw~I hate to use RISA Foundation for something so little like...
  19. McEngr

    Using ACI 546R, latest edition for evaluation/repair of deteriorated concrete

    Has anyone used this specification? We have a huge project where the owner has neglected repairing some concrete pilasters to the point where you can see the cross-ties/stirrups. We are not new to concrete design, just new to the repair of it. We haven't yet purchased the ACI 546, but I...
  20. McEngr

    SE passing raise?

    I have looked on various salary survey websites as well as gostructural.com and I was wondering if anyone else thinks that a structural should make at least $80K as can be seen on the go structural website. In Oregon you have to pass the PE before even taking the SE so I feel it is an even...